Reports until 16:11, Thursday 27 August 2015
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 16:11, Thursday 27 August 2015 (20964)
Ops Day Shift Summary

(All time in UTC)

15:15 Christina opening the roll-up door, OSB receiving area

15:30 Christina done

16:36 Kiwamu to electronics area by PSL and HAM6

16:59 Sudarshan has been doing Pcal swept sine. Now done.

           Kiwamu done

17:00 Observing intent bit set. SDF hasn't been cleared at this point. See attachment.

17:34 Bubba to Mid station

18:03 Intent bit switched to Commissioning. Flipped DHARD 20-30 Hz BP filters.

18:05 Intent but switched back on

18:33 Kyle to beam tube near EY to make measurement. 300 m away from EY.

18:36 Wind picking up. Reaching 30 mph.

           Intent bit swited to Commissioning. Daneil to CER.

18:53 Daniel back. Intent bit Observing.

19:00 Calibration group taking over. Bring interferometer to down. Intent bit set to Commissioning

19:11 Kiwamu to LVEA doing OMCDCPD measurement

19:23 Fire protection Specialists back on site. Fire suppression in Network Room.

19:30 Sheila to LVEA looking for Kiwamu.

19:38 Kyle back

20:47 Sheila locking MICH

           Something water on site. Couldn't hear the guy. Let a white pick-up truck in.

21:09 Bubba done

21:42 Travis, Sudarshan, Darkhan to EY (Pcal calibration)

19:02 Hand the ifo over to Patrick