While I was out on vacation, Chris and Joe cut 3 of the 25# rolls of aluminum into 10' lengths and completed installation of those to the Mid station on the upper section of the enclosure. Additionally they have cleaned and installed strips on 240 meters of enclosure north of the Mid station to date.