Displaying report 1-1 of 1.
Reports until 00:00, Sunday 30 August 2015
H1 General
travis.sadecki@LIGO.ORG - posted 00:00, Sunday 30 August 2015 (21022)
OPS Eve shift summary

After the 40mph wind storm died down, I began the locking procedure.  No full initial alignment was required, just some touching up of the PRMI SUSes.  The only hurdle was detailed in aLog 21016, which took around 30 minutes to overcome.  Kiwamu has been running Calibration excitations for a good portion of the lock stretch.

0:52 Started locking procedure

2:24 Locked on Low Noise

4:12 Started PCal/DARM measurement at Kiwamu's request

4:31 Switched to Observing

4:45 Switched to Calibration

6:13 Lockloss, PRM saturation

6:48 Locked Low Noise

Displaying report 1-1 of 1.