Maintenance day tasks
Craned 3IFO TCS chiller to west bay (because Jodi said it really needed to be over there).

I inspected the rigging in the LVEA while in there this morning. All good.

I checked the flow of nitrogen too all of the LTS containers in the LVEA. All have good flow rates.

Checked the electronics room air handler filters, they were O K however there was a fault on the system. One of the outdoor units of the split system had tripped a breaker. I reset the breaker and thermostat and cleared the fault. All units are functioning.

Report of lights not working in the OSB kitchen, found some burned out bulbs and some defective fixtures. New fixtures on order.