corey.gray@LIGO.ORG - posted 16:00, Thursday 03 September 2015 (21173)
Ops DAY Summary

9/3 DAY Shift:  15:00-23:00UTC (08:00-16:00PDT), all times posted in UTC

Locked @Nominal_Low_Noise for ~12hrs with a range ~65Mpc.  Kept H1 in Observation Mode as much as possible (there were a few errant drops & then we stayed down for PEM Injections starting at around noon (PST).  I went through the Operator Checklist & completed most of it.  I am supposed to check the Visitor Checklist, and it looks fine.  I hesitated to check the HEPI watchdog saturation counter, for fear it might add diffs to the SDF (might try it tomorrow).

Remember: 

  1. AFter lockloss, "INIT" ISC_LOCK (and possibly select DOWN).
  2. Re-enable Transient Injections (to make CALCS SDF green), after PEM Injections
  3. Make sure SDF is made GREEN after "Commissioning" work (I see HAM6 ISI has some diffs...& I see this is probably related to PEM injections).
  4. IP-9 at MY still has HV values around 7kV.

End of shift Control Room Activities: