Injection |
Time of first injection, UTC |
Injection spacing |
Total number of injections |
Good channels for environmental signal |
|
Sept. 2 |
|
|
|
Truck braking by EY station parking area |
22:56:00 |
5s |
6 |
EY seismometers |
|
Sept. 3 |
|
|
|
OSB shipping roll up door actuation |
2:46:00 2:47:00 |
5s 5s |
6 6 |
vertex seismometer and/or output optics mic |
Loud Bach in control room (2s bursts of music) |
2:52:00 |
5s |
12 |
input optics mic |
Loud Underworld in control room (bass heavy) |
2:55:00 |
5s |
12 |
input optics mic |
Single bounces on exercise/seating ball in control room |
2:57:00 |
5s |
12 |
HAM2 seismometer, vertex seismometer |
Dropping large super ball from about 5 feet onto control room floor |
2:59:00 |
5s |
12 |
H1:PEM-CS_ACC_LVEAFLOOR_HAM1_Z
|
5 people jumping in synch in control room |
3:01:00 |
5s |
12 |
HAM2 seismometer, vertex seismometer |
I've attached the result.
Quick conclusion: Dropping large super ball and people jumping in control room coupled into DARM.
In case people wonder what's the super ball looks like, I've attached a photo as well.
No more super ball during observing run =(