Displaying report 1-1 of 1.
Reports until 00:03, Saturday 05 September 2015
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 00:03, Saturday 05 September 2015 - last comment - 00:32, Saturday 05 September 2015(21229)
Ops EVE Shift Summary

23:00 IFO has been locking. The operation mode is OBSERVING. We're hoping for a record breaking today (I was told that the longest lock we had was 20 hours during ER7).

           Craig, Kiwamu, Darkhan, Sudarshan doing calibration work, Robert doing PEM injections.

23:59 Robert picking things up in LVEA, then go to EY to do more injections.

           Intent bit switched to Commissioning.

01:30 Robert back.

03:00 Robert done for tonight. Dan and Evan working on PZT. Intent bit remains Commissioning.

04:36 Go back to Observing.

05:01 Wind picking up speed. A wind gust just reached 40 mph but seems to be coming down quickly.

05:44 THE INTERFEROMETER HAS STAYED LOCKED FOR 24 HOURS and is continuing to do so!

07:00 Hand over to Patrick.

Images attached to this report
Comments related to this report
nutsinee.kijbunchoo@LIGO.ORG - 00:32, Saturday 05 September 2015 (21230)

The ifo dropped lock at 7:13 UTC due to a 5.6M earthquake in Alaska. A new lock stretch record is set at 25 hours 30 minutes =D

Displaying report 1-1 of 1.