07:12 UTC Handoff from Nutsinee. H1 in observing mode at around 70 Mpc. Kiwamu only other person here. 07:16 UTC Lights are off in the LVEA and PSL enclosure. Lights appear to be off at the mid and end stations. 07:17 UTC Checked IP9. Both A and B pumps HV around 7kV. 07:53 UTC Momentary end X HEPI pump station pressure minor alarm. 08:52 - 08:58 UTC Stepped out of control room. 09:06 UTC Kiwamu leaving site. I'm alone. 10:50 - 10:57 UTC Stepped out of control room. No lock losses or changes in observing mode. SUS ETMY saturations at 08:44:54 and 11:00:19 UTC.