ALL TIMES IN UTC
ACTIVITY LOG:
17:30 Kissel on site
18:44 ETMY Saturation
19:00 Kiwamu on site
19:45 Sheila on site
20:22 Sudarshan on site
21:02 ETMY Saturation
21:13 Wind picked up from 5 to about 15 in the last couple of minutes. No biggie.
21:18 Looks like another quake from the same New Zealand area is shaking us causing SRM saturations.
21:39 Sheila taking advantage of this Lockloss to try a different PRM offload to be able to ride out earthquakes better.
22:36 Jeff B on site for evening shift
22:46 Darkham on site
Handing off to Jeff - Undisturbed
LOCK LOG:
16:58 DRMI finally able to lock
17:06 Lockloss at SWITCH_TO_QPDS
17:21 DRMI locked
17:24 Lockloss @ DRMI_ON_POP
17:43 DRMI locked
17:56 Locked @ NOMINAL_LOW_NOISE 66Mpc
21:33 Lockloss - New Zealand quake
Summary:
Not too much to summarize. The time logs tell the story.