LVEA: Laser Hazard IFO: Locked Intent Bit: Observing All Times in UTC (PT) 23:00 (16:00) Take over from Ed 23:00 (16:00) IFO Locked at NOMINAL_LOW_NOISE, 23W @70Mpc 23:18 (16:18) Commissioners commissioning work while LLO is recovering 23:25 (16:25) Kiwamu – Loading foton files for calibration 23:37 (16:37) Lockloss - 23:42 (16:42) Stop at LOCK_DRMI_1F for commissioning work 23:48 (16:48) Lockloss - 00:00 (17:00) Stop at DRMI_LOCKED for commissioning work 00:05 (17:05) Lockloss – 01:09 (18:09) Stop at DRMI_LOCKED for commissioning work 02:12 (19:12) Locked at NOMINAL_LOW_NOISE, 22.9W, 74Mpc 02:16 (19:16) Set intent to Observing Mode 07:00 Turnover to Travis Shift Summary & Observations: Took over from Ed at 23:00 (16:00). IFO has just relocked at the shift change. Intent bit set to Observing. LLO is down, working on relocking problem. Commissioners working on IFO while LLO is down Saturations of ETMX at 00:01, 00:02, 00:03 while at DRMI_LOCKED 00:45 (17:45) Reset fiber polarization for Y-Arm to get ALS to lock 02:15 (19:15) 4.5 mag earthquake in Hawthorne, NV – Did not lose lock 02:50 (19:50) 5.2 mag earthquake near L’Esperance Rock, New Zealand – Did not lose lock Smooth shift with good locking range.