Log:
-
1500 (800 PST) - IFO --> DOWN
-
1503 - Bubba starting Grouting, he will be going in and out of the southwest door of the South Bay.
-
1504 - Karen rolling up receving bay door
-
1515 - Karen/Christina heading to ends to clean
-
1519 - Peter to Diode room to turn on laser WD on the PSL Beckhoff computer
-
1520 - Patrick restarting Conlog
-
1520 - Peter back
-
1526 - Ken in the MSR to repair UPS
-
1531 - Jim B starting Frame writer work (fw0 & fw3)
-
1534 - Elli taking the IFO to measure SRC Gouy phase
-
1541 - UPS back up and running
-
1616 - Karen/Christina going from EX to EY
-
1616 - Dick G to Optics Lab
-
1626 - Kiwamu transitioning LVEA to laser SAFE
-
1626 - Jeff K to LVEA to pick up some electronics
-
1630 - Jordan/Vinny to EY switching magnetometer filter box
-
1633 - Jim B starting fw1
-
1636 - Ken to LVEA to talk to Bubba
-
1637 - Jeff K out of LVAE
-
1640 - Elli done (because we switched to laser SAFE)
-
1645 - Betsy starting EX charge measurements
-
1650 - Jeff K to EY for UIM measurement
-
1708 - Karen/Christina done with ends
-
1712 - Ken to Y28
-
1712 - Kyle to EX to replace annulus ion pump
-
1716 - Fil/Andres to X vault to look at PEM channels
-
1724 - Jim W BS exc
-
1730 - Jodi to LVEA for 3IFO whatnots
-
1745 - Jim W done
-
1748 - Jordan/Vinny to EX to swap magnetometer filter box
-
1803 - Jodi out
-
1825 - Jordan/Vinny back
-
1832 - Jodi to LVEA to look for function generator
-
1835 - Ken back
-
1850 - Jeff K done at EY
-
1853 - Jodi out
-
1900 - Betsy starting EY charge measurements
-
1911 - Dave restarting Cal/OMC models (the Duotone work)
-
1920 - Bubba/Chris out
-
1931 - Keita/Sheila into PSL to swap PZT LPF
-
2021 - Keita/Sheila out of PSL and done with PZT peri LPF
-
2021 - Nutsinee starting HWS realignment
-
2109 - Nutsinee done
-
2123 - Sheila into the CER
-
2142 - Sheila out of the CER
-
2151 - Kyle done at EX
-
2152 - Start of Locking
-
2208 - Initial alignment
Handing off to Jeff B trying to lock DRMI_1F.
Longer maintenance Day, but no huge surprises.