Reports until 20:11, Tuesday 08 September 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 20:11, Tuesday 08 September 2015 (21317)
Evening Mid-Shift Summary
- Took over from TJ at 23:00 (16:00). Commissioners/Ops working on relocking IFO until 02:00 (19:00).
- Set Obs Mode to commissioning – Commissioners working while LLO is down.
- After some initial locking problems, the IFO has been stable locked at 22.9W with approximately 65Mpc. The shift is running smoothly. 
- I added 125ml water the crystal chiller.