Reports until 00:28, Friday 11 September 2015
H1 AOS
jeffrey.bartlett@LIGO.ORG - posted 00:28, Friday 11 September 2015 (21392)
Evening Shift Summary
Title: 09/10/2015, Evening Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC
Support: Jenne, Evan, Jeff K., Sheila 
Incoming Operatror: Cheryl
Shift Summary: 
- Attend operators training meeting until 23:10 (16:10)
- In Maintenance Mode due to S&K Electronics hammering drilling at End-Y 
- S&K Electronics finished – Turn IFO over to Kiwamu for commissioning work
- Repaired leak in OSB sprinkler system – Have informed Facilities
- Dropped out Observing mode to Commissioning – Turn IFO over to Evan for commissioning work. LLO was not in Observing Mode.

Activity Log: All Times in UTC (PT)

23:15 (16:15) Take over from TJ
23:15 (16:15) IFO locked at NOMINAL_LOW_NOISE, 22.7W, 60Mpc
23:34 (16:34) Switch Observatory Mode from Maintenance to Commissioning
01:24 (18:24) Dick G – Out of the Optics lab
02:01 (19:01) Set intent bit and Observatory Mode to Observing at 22.7W 72Mpc 
02:50 (19:50) Lockloss – Cause unknown
03:14 (20:14) IFO locked at NOMINAL_LOW_NOISE, 22.6W, 69Mpc
03:16 (20:16) Set intent bit and Observing Mode to Observing
03:24 (20:24) Commissioners reloaded Guardian code – DID NOT DROP OUT OF OBSERVING
04:42 (21:42) Drop to Commissioning mode per commissioner’s request
07:28 (00:28) Turn over to Cheryl