Reports until 14:50, Friday 11 September 2015
LHO FMCS
bubba.gateley@LIGO.ORG - posted 14:50, Friday 11 September 2015 (21408)
Beam Tube Enclosure Joint Repair on the X-Arm
Chris S. Joe D.-40% each.

This week the guys had to cut 2 more of the 25# rolls into strips and punch holes. They were able to install strips on the top of 120 meters of enclosure making a total of 2280 meters completed.