David Jones was on the schedule today, but he needed to do work down at the EY. Thomas covered the morning, and I covered the rest of the day.
-
Main activity today was Dome re-installation on BSC8
-
Instrument Air FAULTED at EX--this was due to HEPI pump work by Apollo
-
Dust Monitors around BSC8 & 7 would have randomly huge peaks during the day (even at lunch time)
-
Patrick re-started the EX Weather Station