TITLE: 9/11 EVE Shift: 23:00-7:00UTC (16:00-0:00PDT), all times posted in UTC
STATE Of H1: Shift started in Commissioning (Evan working on DARM) with H1 newly locked (30min) with a range of ~75Mpc.
OUTGOING OPERATOR: TJ was on DAY shift.
QUICK SUMMARY: 4.5Magnitude earthquake in Mexico started dying down around the time I arrived (low freq still slightly elevated). Winds under 10mph. TJ thought LLO was down for PEM injection work.