thomas.shaffer@LIGO.ORG - posted 16:53, Friday 11 September 2015 (21411)
Ops Day Shift
Log:
Times in UTC (PST)
1500 (800) Locked at Nominal Low Noise when I arrived
1542 Chris/Joe will be heading down the arms to do more seam sealing on the beam tube enclosures.
1616(916) Kyle will be breifly going past the card reader in the CS, driving around Corner Station to pick up nitrogen tanks, and then going to the X28 port.
1621 Taken out of Observe to allow for Kyle's driving, beam tube enclosure sealing, and Betsy doing SDF work
1630 Betsy done
1754 (1054) Dick G to the optics lab
1920 (1220) Jodi to MX
1948 Jodi back
2027 (1327) Joe/Chris done
2108 (1408) Evan doing some DARM reshaping, out of Observe
2110 Bubba down the Xarm to check on earlier work
2130 Bubba back
2138 Lockloss (May have been due to a few earthquakes. There was a 5.2 in Mexico and a 5.4 in Japan that should have arrived at similar times.)