Reports until 17:39, Saturday 12 September 2015
LHO General
corey.gray@LIGO.ORG - posted 17:39, Saturday 12 September 2015 - last comment - 19:32, Saturday 12 September 2015(21443)
Transition To EVE Shift Update

TITLE:  9/12 EVE Shift:  23:00-7:00UTC (16:00-0:00PDT), all times posted in UTC

STATE OF H1:  Relocking, but also riding out remnants of New Zealand EQ from 2hrs earlier.  

OUTGOING OPERATOR:  Jim

QUICK SUMMARY:  Walked in to H1 in Lock Acquisition, and saw several attempts during high seismic noise.  

Once in NOMINAL_LOW_NOISE, Evan took over for commissioning (I talked with Joe at LLO and they were having Bounce Woes.  When they get it locked, Anamaria/Robert would probably take L1.  So they will be out of Observation for a while.  In the meantime, Evan will conduct Noise Budget injections.  

Seismic coming down & winds inching up.

Comments related to this report
corey.gray@LIGO.ORG - 18:55, Saturday 12 September 2015 (21447)

EARTHQUAKE COMING!!  EARTHQUAKE COMING!!  

1:55 UTC:  5.8 earthquake from Indonesia on the way-->  ETA of Rayleigh wave:  2:10UTC

Evan's trying to finish a measurement.  Jenne might try to do some offloading if there's time.....

corey.gray@LIGO.ORG - 19:32, Saturday 12 September 2015 (21448)

False Alarm:  Did not see anything in the control room for the above-mentioned incoming EQ.  Note:  It's velocity was 0.59um/s (compared to 1.1um/s of similar magnitude New Zealand quake which kept us down for 2+hrs.