This afternoon, after a quick consult between IAS/SUS (Dennis, Calum, Hugh, Gerardo, Travis, Doug, Jason, me), it was decided that we would proceed with translating the QUAD to bring the longitudinal measurement back into tolerance. So, we will mobilize to push the suspension ~4mm towards the corner station. Doug has confirmed that on Monday (and probably Tuesday) IAS/SUS together will: - fix pitch R0 - translate QUAD longitudinally, monitoring yaw, x, y --Need to insert possible "fix" to R0 roll/side shift if indeed we need to. Norna is checking on tolerances of these DOFs. - make IAS gap measurement - Adjust R0 to fix gap and yaw if needed. OSEM general health has been checked, and all open light voltages have been measured and set.