Mid-Shift Summary - Evening

Mid-Shift Summary:

Comments related to this report
richard.savage@LIGO.ORG - 00:32, Wednesday 16 September 2015 (21567)CAL

When the Beckhoff crate when down last night the Pcal laser shut down, likely due to not getting the enable signal from the Beckhoff chassis.

When it was swapped the second time, (original unit swapped back in?) the Optical Follower Servo was not locked.  Opening, then closing the loop allowed the loop to relock.