Displaying report 1-1 of 1.
Reports until 08:36, Friday 18 September 2015
LHO General
patrick.thomas@LIGO.ORG - posted 08:36, Friday 18 September 2015 (21650)
Ops Day Beginning Shift Summary
TITLE: 09/18 [DAY Shift]: 15:00-23:00 UTC (08:00-16:00 PDT), all times posted in UTC
STATE Of H1: Locked at Low Noise, Observing Mode, range around 68 MPc.
OUTGOING OPERATOR: Corey G.
QUICK SUMMARY: Lights are off in the LVEA, PSL enclosure, end X, end Y and mid X. I can not tell from the camera if they are off at mid Y. Seismic in 0.03 - 0.1 Hz band has recovered from a peak to ~1 um/s about 5 hours ago, now around 10^-2 um/s. Seismic in 0.1 - 0.3 Hz band has been trending slowly down over the last 18 hours, is now below 10^-1 um/s. Winds are less than 20 mph, may be starting to come up. Range has been trending down since the beginning of the lock about an hour and a half ago. Started around 75 MPc, now around 68 MPc.

O1 HAS BEGUN!
Displaying report 1-1 of 1.