Title: 9/19 Day Shift 15:00-23:00 UTC (8:00-16:00 PDT). All time posted in UTC.
State of H1: Lock acquistion.
Outgoing Operator: Jeff Bartlett
Summary: A series of EQs in Chile have had the IFO down for most of the OWL shift. They have rung down enough now that we should be able to lock. Alignment looks good, so I will attempt to relock without initial alignment first.