Title: 9/20 Day Shift 15:00-23:00 UTC (8:00-16:00 PST).  All times in UTC.

State of H1: Lock Acquisition

Shift Summary:  Locked for all but the last hour of my shift.  Several ETMy saturations throughout the shift.  I ran through initial alignment after lock was lost.  Winds are highish.  During the unlocked period, I changed the ALS-Y_WFS_DOF3 GAINs back to their old values (and accepted them in SDF) per Evan's advice.

Incoming operator: TJ

Activity log:

22:27 Started initial alignment

23:00 Initial alignment complete, lock acquistion, hand over to TJ.