All buildings are beginning to respond to the lower outdoor temperatures so Bubba and I have turned on heaters in both end stations and the LVEA.
One stage of HC5 is now on in the LVEA. This will impact the input chambers the most. The response appears to be ~0.5 F.
The End stations have variac control so these have been incremented from 4ma(off) up 8.5ma