The cosmic ray detector was decommissioned. The H1 PSL, H1 TCS, and PCal lasers were turned off. All VEA's were transitioned to laser safe. Cheryl and Aidan began decommissioning the H2 TCS lasers. Crane lift testing and inspection was done at end X and mid Y. Contractors from Apollo started cleaning the crane equipment in the LVEA. Left with Cheryl in LVEA ~ 16:11