TITLE: 09/25 [EVE Shift]: 23:00-07:00 UTC (16:00-00:00 PDT), all times posted in UTC STATE Of H1: Observing, ~67 MPc SHIFT SUMMARY: Recovered from two lock losses. The cause of the first is unclear. The second was likely from a 6.2 magnitude earthquake in Chile. After recovering from the earthquake I put it into commissioning mode to allow Chris to do hardware injections while LLO was down. He is done and we are back to observing. INCOMING OPERATOR: Ed