nutsinee.kijbunchoo@LIGO.ORG - posted 16:49, Saturday 26 September 2015 (21981)
Day Shift Summary

TITLE: 09/26 [DAY Shift]: 15:00-23:00 UTC (08:00-16:00 PDT), all times posted in UTC

STATE Of H1: Observing at ~75 Mpc

SUPPORT: Mike

QUICK SUMMARY: Less 45MHz glitches during my shift. DHARD Y boost turned off (as MIke requested). Wind speed coming below 20 mph. Several small earthquakes throughout the shift.

INCOMING OPERATOR: Patrick

ACTIVITY LOG:

18:07 Jodi to high bay area looking for contamination control stuff. Still observing.

18:14 Jodi out

19:08 Switched the ifo to Commissioning to turn off the DHARD Y boost filter. 

19:09 Back to Observing

22:33 A big tour group starting to march in the control room. ~20 adults. There was also a 5.1M earthquake at Pacific-Antarctic Ridge arrving at about the same time so there were glitches in DARM during the time. Just in case anyone wants to look into outreach noise. 

22:46 Group leaving.

23:00 Handing off to Patrick.