Reports until 16:00, Sunday 27 September 2015
LHO General
patrick.thomas@LIGO.ORG - posted 16:00, Sunday 27 September 2015 (21999)
Ops Eve Beginning Shift Summary
TITLE: 09/27 [EVE Shift]: 23:00-07:00 UTC (16:00-00:00 PDT), all times posted in UTC
STATE Of H1: Observing at ~70 MPc
OUTGOING OPERATOR: Nutsinee
QUICK SUMMARY: Lights appear off in the LVEA, PSL enclosure, end X, end Y and mid X. I can not tell from the camera if they are off at mid Y. Seismic in 0.03 - 0.1 Hz band is ~.02 um/s. Seismic in 0.1 - 0.3 Hz band is ~.06 um/s. Wind speeds are less than 20 mph.