Displaying report 1-1 of 1.
Reports until 16:06, Tuesday 29 September 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:06, Tuesday 29 September 2015 (22085)
Ops Day Shift Summary
Activity Log: All Times in UTC (PT)

15:00 (08:00) Take over from TJ
15:00 (08:00) Start of maintenance window
15:00 (08:00) Christina & Karen – Cleaning at End-Y
15:00 (08:00) Richard – Going into CER to work on 45Mhz driver
15:10 (08:10) Sprague – On site *Joe D. to escort through LVEA, Mid and End Stations
15:18 (08:18) Peter – Going into LVEA to work with Richard on 45Mhz driver
15:22 (08:22) Ken – Working on the solar power on X-Arm
15:22 (08:22) Leslie – Going to End-X and End-Y for cleaning work 
15:24 (08:24) Lockloss – Maintenance
15:25 (08:25) Hugh – Taking down HAM5 ISI for Rouge excitation fix
15:26 (08:26) Keita – Going into PLS to swap 45Mhz driver
15:28 (08:28) Filiberto & Manny – Taking photos of electronics racks at Mid-X
15:42 (08:42) Bubba – Going to End-Y chiller yard to replace vibration dampers on compressor
15:48 (08:48) Filiberto & Manny – Taking photos of electronics racks at Mid-Y
15:50 (08:50) Jim B. – Working on hardware injection computer
15:54 (08:54) Hugh – Going to both end stations to check HEPI fluid levels
15:55 (08:55) Betsy – Running charge measurements at both end stations
16:00 (09:00) Christina & Karen – Cleaning at End-X and End-Y NOTE: A lot of moths at End-Y
16:00 (09:00) Robert & Vinnie – at End-Y glitch hunting 
16:05 (09:05) Filiberto & Manny – Taking photos of electronics racks at End-Y
16:07 (09:07) Mitch – In LVEA to place signage – will open receiving roll-up door
16:09 (09:09) Betsy – In LVEA to help Mitch and hunt for parts
16:09 (09:09) Jodi – In LVEA to check 3IFO stuff
16:10 (09:10) Jason & Peter – Moving PSL equipment from OSB to LSB
16:10 (09:10) Filiberto & Manny – Finished at End-Y – heading for the LVEA
16:13 (09:13) Keita – Out of the PSL
16:30 (09:30) Hugh – Shutdown dust monitor at both end stations
16:30 (09:30) Mitch – Finished in the LVEA
16:30 (09:30) Filiberto & Manny – In LVEA by HAM3 taking photos of electronics racks
16:32 (09:32) Hugh – Checking CS HEPI fluid levels 
16:33 (09:33) Jodi – Out of the LVEA 
16:35 (09:35) Betsy – Out of the LVEA
16:37 (09:37) Filiberto & Manny – Out of the LVEA
16:45 (09:45) Hugh – Delivering 3IFO parts to storage in the LVEA
16:50 (09:50) Jodi – Taking tour through LVEA
16:55 (09:55) Jason & Peter – Finished moving PSL parts
17:00 (10:00) Mitch – Moving (forklift) load from LSB to VPW
17:10 (10:10) Add 175ml water to PSL crystal chiller
17:12 (10:12) Kyle & Joe – Taking 1-Ton and trailer to near End-X to recover leak detector 
17:18 (10:18) Christina & Karen – Cleaning in the LVEA
17:30 (10:30) Bubba & John - Going to End-X chiller yard to replace vibration dampers on compressor
17:31 (10:31) Beverage service on site to check the vending machines
17:35 (10:35) Corey & Patrick – Going to sweep End-Y
17:39 (10:39) Gerardo – Delivering batteries to near both end stations
17:46 (10:46) Vinnie & Jordan – Going to both end stations to install PEM equipment
17:47 (10:47) Paradise Water on site
17:47 (10:47) PraxAir truck leaving site (was at Mid-X)
17:52 (10:52) Ken – Going to work on solar panels on Y-Arm
18:05 (11:05) Sudarshan – Taking TFs at End-X 
18:12 (11:12) Karen & Christina – Out of the LVEA
18:15 (11:15) Corey & Patrick – Going to sweep End-X
18:34 (11:34) Betsy & Cheryl – Sweeping the LVEA
18:45 (11:45) Gerardo – Going to End-X to check annulus gages
18:45 (11:45) John & Bubba – Finished with chiller work – Checking gauges in End-X
18:48 (11:48) Richard – In LVEA to shut off wireless APs
20:06 (13:06) IFO Locked at NOMINAL_LOW_NOISE 22.5W, 62Mpc
20:32 (13:32) Lockloss – See aLOG 22073
20:41 (13:41) Kyle & Joe – Out to X2A and Mid-X
20:42 (13:42) Daniel – Going into CER
20:47 (13:42) Carpet Contractor on site to meet with Bubba
20:47 (13:47) Daniel – Out of CER
22:11 (15:11) IFO locked at NOMINAL_LOW_NOISE, 22.5W, 75Mpc
22:18 (15:18) Set Intent Bit to Observing
23:00 (16:00) Turn over to Travis
  

Shift Summary:
Title: 09/29/2015, Day Shift 16:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)

Support: Sheila, Hugh, Betsy

Incoming Operator: Travis

Shift Summary: 
- 15:00 IFO locked. Observing Mode set to Maintenance. 
- 15:24 Lockloss – Maintenance
- 16:30 Turnoff dust monitors at both end stations
- 17:05 Reset HAM5 L4C Saturation WD
-19:00 Corey & Patrick – Sweep of end stations
-19:00 Cheryl & Betsy – Sweep of LVEA