Activity Log: All Times in UTC (PT)
15:00 (08:00) Take over from TJ
15:05 (08:05) GRB Alert – Switch to Observing mode
16:33 (09:33) Jodi – Delivering storage items to mechanical building
16:59 (09:59) Jodi – Finished with delivery
18:31 (11:31) GRB Alert – In Observing mode before notice
20:47 (13:47) Switch to Commissioning mode – Commissioning work while LLO is down
21:26 (14:26) Kyle & Gerardo – Going to Mid-Y to start rotating pump and leak detector
21:35 (14:35) Dave & Jim – Going to Mid-Y to check on PEM problem
22:31 (15:31) Filiberto – Going to Mid-Y to work on bad AA chassis
22:45 (15:45) Lockloss – Commissioning activities
23:00 (16:00) Turn over to Travis
End of Shift Summary:
Title: 10/01/2015, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
Support: Sheila, Mike,
Incoming Operator: Travis
Shift Summary:
- 15:00 IFO locked. Intent Bit = Commissioning Mode. Wind is calm, no seismic activity. All appears normal. Sheila doing some testing while LLO is relocking.
- 17:05 (08:05) GRB Alert. Switch to Observing mode
- 18:31 (11:31) GRB Alert. In Observing mode
- 23:00 (16:00) Relocking