Reports until 16:10, Saturday 03 October 2015
LHO General
corey.gray@LIGO.ORG - posted 16:10, Saturday 03 October 2015 (22201)
DAY Ops Summary

TITLE:  10/3 DAY Shift:  15:00-23:00UTC (00:00-8:00PDT), all times posted in UTC     

STATE OF H1:  Observation at 75Mpc

SUPPORT:  Evan, Daniel, Robert, Jordan

INCOMING OPERATOR:  Cheryl

SHIFT SUMMARY:  

Started off shift with H1 in DOWN mode.  Established a game plan by talking with Mike & Daniel over the phone.  Evan arrived and started investigations while I re-aligned, and after a few hours we had H1 back up.  It has been up with a decent range around 75Mpc (with a few of the usual ETMy saturations).

LLO is having issues with useism.  Robert is taking advantage of their downtime to run PEM injections.

If you squint your eyes and look sideways, you can see the useism beginning to trend down.  Winds are around 12-15mph.  

Shift Activities: