Reports until 16:14, Monday 05 October 2015
H1 General
corey.gray@LIGO.ORG - posted 16:14, Monday 05 October 2015 (22238)
DAY Ops Summary

TITLE:  10/5 DAY Shift:  15:00-23:00UTC (08:00-16:00PDT), all times posted in UTC     

STATE of H1:  Observation Mode at 78Mpc

Incoming Operator:  Nutsinee

Support:  Full Room

Quick Summary:

~46hr Lock ended by 6.0 Chilean EQ noted by Terramon.  Then went through some acquisition exercises while we waited for the seismic to die down.  H1 brought back to Observation Mode in the afternoon and it is humming along swimingly.

Shift Activities: