Reports until 09:46, Tuesday 06 October 2015
H1 DetChar (DetChar)
christopher.biwer@LIGO.ORG - posted 09:46, Tuesday 06 October 2015 (22263)
DQ Shift Oct. 1 - Oct. 4
Link to the DQ shif paget: DQ Shift page.

Summary:
 * October 1 had locks lost doing injections looking for scattered light in the X end. Otherwise a nice set of data, with a duty cycle ~80%.
 * October 2 and 3 there was some problems locking. High winds, beam splitter optical lever glitching, and ALS X/Y problems locking. At one point ~22 hours unlocked.
 * October 4, recovered from the past two days and had some long locks with a duty cycle ~80%.