Reports until 16:07, Tuesday 06 October 2015
H1 General
edmond.merilh@LIGO.ORG - posted 16:07, Tuesday 06 October 2015 (22284)
Shift Summary - Evening Transition (Maintenance Day)

TITLE:   Oct 6 DAY Shift 15:00-23:00UTC (08:00-04:00 PDT), all times posted in UTC

STATE Of H1: Aligning/Locking

LOCK DURATION: N/A

SUPPORT: Sheila, Jenne, TJ

INCOMING OPERATOR: Nutsinee

Activity log:

14:55 Safety Kleen is on site

14:57 Sheila performing scattered light noise hunting testing on EX WP#5528

14:58 Richard starting his temperature Beckhoff system room temperature sensor work. WP#5534

15:00 Jeff B running forklift WP#5506

15:08 Lockloss

15:12 Jody to begin executing WP#5537 upon completion of Jeff B’s work (#5506)

15:13 Ken out to EY for Solar Panel work WP#5493

15:15 Jim batch informed of DMT maintenance. EQ blrms, range, IR integrand. etc

15:19 Joe out to LVEA to check water, batteries. etc

15:22  Robert’s equipment is unloaded and he will begin PEM injections

15:24 Greg Mendell informed me of the start of the DMT update WP#5522

15:26 Joe turning on lights in LVEA

15:27 Kyle and Gerardo out to  execute WP#5532. Informed me that new LN2 vendor will be arriving on site today.

15:30 Richard is turning on wireless in LVEA. WE NEED TO REMIND THE SWEEP TEAM TO TURN IT OFF.

15:35  Switched observatory mode to Corrective Maintenance

15:40  NORCO on site for LN2 delivery Y end

15:42 Vinnie into the electronics room to investigate two accelerometers.

15:46 Jody called to inform that forklift was loaded and they’re headed down X arm. WP#5537

15:49 Richard finished temp sensors in corner. He’s headed to EX

15:51  Sheila will be breaking the current lock. Betsy will do some charge measurements.

15:53 Hugh out to do weekly HEPI fluid checks at all out buildings and corner.

16:02 Christina called. Leaving EY headed to EX.

16:06 John W driving down to EY to meet LN2 driver.

16:08 Jason in to LDR to do regular weekly Watchdog reset .

16:15 Septic truck on site

16:19 Richard called to confirm operation of sensors at EY

16:23 Ellie and Miguel headed out to ISCT6 to execute WP#5540. (camera)

16:26  Gerardo back from EX to remove some vac equipment to take back to EX

16:30 Richard and Fil at EX for Ecat Temp sensor install/test

16:40  Second Norco truck on site to service CP2

16:42  Christina leaving EX. Returning to get mid station key.

17:01 Sheila is going to start the A2L script testing.

17:05  Vinnie to EX

17:06  Jodie and Jeff done at MX and headed to MY.

17:07  Kyle back from EX

17:07  Safety Kleen leaving site

17:08 John Back from EY

17:15  Richard and Fil are done.

17:28 Eliie and Miguel out of the LVEA for the moment. They plan to return.

17:30  Fil out to Biergarten to label TCS racks.

17:37 Christina leaving MX and heading to MY

17:48  Ellie and Miguel back out to ISCT6. Misaligned SRM, PRM and ITMX for single beam

17:55 Jody called. They’re done at the Mid stations. They’re going to park the forklift by the LSB.

17:57  Richard down to EY to join Ken.

18:03 Ace finished on Y arm and heading down X arm

18:04  Bubba moving something with a forklift from LSB to OSB.

18:05 Vinnie called to let me know that he’s at EY.

18:14 Jody and Jeff out to LVEA to pull temperature data from 3IFO containers

18:19  Hugh to end stations for photos

18:20 Christina and Karen into LVEA for cleaning

18:23 EY LN2 truck leaving

18:26 Evan out to LVEA to look at ISC racks by the PSL

18:29 Evan back

18:44  Ellie and Miguel out of LVEA

18:46 Ellie back out to put in a beam dump

18:47 Jody and Jeff are out of the LVEA

18:48  Carlos done for the day

18:52  Ellie out

18:54 Landry into LVEA for photos

19:06 Richard out to LVEA to turn wireless router off and turn off power distribution cart by output arm.

19:15 Gerardo called from EX (phone showed MY). Pumpe replaced but auc cart neds to stay running for another hour to hour/half

19:30 Kyle leaving Xarm and travelling to EY to check something

19:31 Vinnie back from EY

19:38 Robert and Vinnie ou to EY to position a magnetometer

19:57 LVEA sweep team headed out to the LVEA

20:01 Science mode (after locking) will be hindered by an aux pump still running at EX, Dave and Jonathan doing computer work and an SDF change that’s going to happen due to PEM work at EY to investigate glitching. THe latter will require a work permit that will remain open as the present work will be a temporary fix.

20:18 Ellie is still in the LVEA for Fine Aligning of ISCT6 LVEA sweep will be final upon her exit. Wireless Router was turned back on for her use.

20:35 Dither align script has been renamed from what the wiki page says “ ./dither_align.py” to “./ditherAlign.py”

20:35  Begin initial alignment

22:25  Jeff B into the optics lab

22:33 Jeff B out of the optics lab

23:00 Still struggling to re-lock. Handing off to Nutsinee

 

Shift Summary: See Activity Log