TITLE: Oct 8 DAY Shift 15:00-23:00UTC (08:00-04:00 PDT), all times posted in UTC
STATE Of H1: Commissioning
LOCK DURATION:~4hours (this shift)
SUPPORT: All commissioners
INCOMING OPERATOR: Nutsinee
Activity log:
15:00 IFO taken to commissioning for today’s activities
15:01 Evan out to LVEA to get some cables
15:03 Jeremy called from LLO to confirm the beginning of joint commissioning activities
15:04 Lights switched on in the LVEA
15:08 Patrick doing CONLOG testing
15:11 Evan performing WP#5543
15:31 Noticed that the DARM spectra FOM had stopped. Will wait to restart after Evan is done taking measurements. NDS1 seems to have died. No CDS techs on site. E-mail sent.
16:25 Dave called about the NDS1 server. He’s taking a look
16:30 Premier Flooring on site.
16:31 D Barker re-started NDS1 server
17:11 IFO handed over to Robert Schofield for PEM injections
18:10 Robert handed IFO back over to Evan
18:12 Richard out to the roof for Camera install work
19:06 Ellie and TJ to CER to plug in wireless router
19:11 Ellie and TJ are back
19:15 IFO unlocked by Ellie for her measurements. WP#5548
19:30 Ellie out to ISCT6
19:35 ASC restart
20:18 Bubba and John into the LVEA by the Yarm
20:33 Bubba and John out of LVEA
21:05 Ellie out of the LVEA
21:10 John into LVEA for a tour
22:15 begin initial alignment
22:29 RF45 cable was changed for a shorter one. Keita needs a free-swinging Michelson to do a phase measurement before we proceed with locking.
Shift Summary: Commisioning Day