Displaying report 1-1 of 1.
Reports until 00:04, Saturday 10 October 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 00:04, Saturday 10 October 2015 (22386)
Ops Evening Shift Summary

Activity Log: All Times in UTC (PT)

23:00 (16:00) Take over from Ed
23:00 (16:99) Intent Bit set at Observing
23:40 (16:40) Finished GRB hold
23:58 (16:58) Kyle & Gerardo – Back from Mid-Y
06:15 (23:15) Nutsinee – Left the site
07:00 (00:00) Turn over to Travis


End of Shift Summary:

Title: 10/09/2015, Evening Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT)

Support: Marissa

Incoming Operator: Travis

Shift Summary: 
- 23:00 (16:00) IFO locked. Intent Bit set to Commissioning. Wind is moderate, some seismic activity.     
- 23:00 (16:00) Received GRB alert at 22:40 – Held site in stand down mode until 23:40 (16:40).

    A smooth and quiet shift. Some wind (gust up to mid 30mph) and moderate seismic activity in first part of shift. Wind and seismic activity settling down toward end of shift. Had nine (9) saturation alarms during shift.     	
Displaying report 1-1 of 1.