Title: 10/10/2015, Evening Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT) State of H1: At 23:00 (16:00) Unlocked due to high wind and seismic activity. Running initial alignment. Outgoing Operator: TJ Quick Summary: Wind is high 35mpg with gusts to over 40mph; seismic activity is also high. At shift change, TJ was finishing an initial alignment. Now trying to relock.