Title: 10/11 Day Shift 15:00-23:00 UTC (8:00-16:00 PST). All times in UTC.
State of H1: Unlocked, high winds and high microseism
Shift Summary: Locked until 21:24, haven't been able to relock since due to environment issue.
Incoming operator: Jeff B.
Activity log:
-
16:21 Reached Nominal Low Noise, Sheila will start A2L measurements
-
17:06 Observing, accepted blend changes in SDF
-
17:29 ETMY sat
-
18:03 ETMY sat
-
18:58 Realized that I've been spelling summary as "summery" in all of my ops posts
-
19:25 Jeff K opened H1CALCS Tp 0
-
20:22 Jeff K closed H1CALCS Tp 0
-
21:40 ETMY sat (x2)
-
22:23 ETMY sat