Title: 10/12/2015, Owl Shift 07:00 – 14:30UTC (00:00 – 07:30PT) State of H1: Locked in NOMINAL_LOW_NOISE at 73.2Mpc, in Observe for 21 hours. Incoming Operator: TJ Quick Summary: - Nothing to report since Chris Biwer finished his hardware injections 8:10UTC (see his alog)
- Talked to LLO, and was told their GraceDB is still down, so call if we get an alarm.- Still to try: Switch ISI Blend Filters after lock loss, and try the Quiet 90 filters on BSC chambers.