10-12-15 Morning Meeting Minutes
· SEI – Running 45mHz blends are running on the BSC ISIs, may need to change them soon.
· SUS - Needs charge measurement tomorrow.
· ISC – Needs noise measurement of LV esd
· Vac – Leak testing, no N2 deliveries this week.
· Fac – Work with the water tank, starting again on the crack sealing on beam tube sealing during Observing.
· PEM – Completed tamper inj at CS, but still needs ends. Needs about a two hours for both end stations.
· Maintenance items:
o ESD measurement - Keita
o Slow controls testing DAQ – JH
o PCal calibrations X/Y ends (Needs ETMs aligned) – Pcal team
o Copy HW Inj Infrastructure to PCalX – Jeff K
o Return HEPI pump pressure sensors to norm – Hugh
o PEM inj, possible gluing to mirror in PSL – Robert
o Finish deinstallation of old roof cam - Richard
o PEM temp sensors on chambers – Richard
o Fire dept. maintenance on hydrants
o Plumbing in the LVEA – Jeff B.
o Phone identification signs in ends/mids – Bubba
o Jim wants to take some transfer functions on HAM BSC (probably not yet)
o Load from MY to staging building – Jodi
o Pulling cables from ends to 250 mark for ion pumps – CDS
o Sataboy, storage data for DMT, work - Carlos