Reports until 09:01, Monday 12 October 2015
LHO General
thomas.shaffer@LIGO.ORG - posted 09:01, Monday 12 October 2015 (22434)
Morning Meeting Minutes

10-12-15 Morning Meeting Minutes

·      SEI – Running 45mHz blends are running on the BSC ISIs, may need to change them soon.

·      SUS - Needs charge measurement tomorrow.

·      ISC – Needs noise measurement of LV esd

·      Vac – Leak testing, no N2 deliveries this week.

·      Fac – Work with the water tank, starting again on the crack sealing on beam tube sealing during Observing.

·      PEM – Completed tamper inj at CS, but still needs ends. Needs about a two hours for both end stations.

·      Maintenance items:

o   ESD measurement - Keita

o   Slow controls testing DAQ – JH

o   PCal calibrations X/Y ends (Needs ETMs aligned) – Pcal team

o   Copy HW Inj Infrastructure to PCalX – Jeff K

o   Return HEPI pump pressure sensors to norm – Hugh

o   PEM inj, possible gluing to mirror in PSL – Robert

o   Finish deinstallation of old roof cam - Richard

o   PEM temp sensors on chambers – Richard

o   Fire dept. maintenance on hydrants

o   Plumbing in the LVEA – Jeff B.

o   Phone identification signs in ends/mids – Bubba

o   Jim wants to take some transfer functions on HAM BSC (probably not yet)

o   Load from MY to staging building – Jodi

o   Pulling cables from ends to 250 mark for ion pumps – CDS

o   Sataboy, storage data for DMT, work - Carlos