david.barker@LIGO.ORG - posted 12:20, Thursday 16 February 2012 (2244)
MSR and control room upgrades
H1 front end racks were installed into the MSR and populated with computers. The first two of the H2 racks were installed and have front ends installed except those currently running the H2OAT.