Reports until 00:03, Tuesday 13 October 2015
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 00:03, Tuesday 13 October 2015 (22455)
Ops EVE SHift SUmmary

TITLE: "10/08 [EVE Shift]: 23:00-07:00UTC (16:00-00:00 PDT), all times posted in UTC"

STATE Of H1: Observing at ~75 Mpc for the past 5 hours

SUPPORT: Sheila, Jeff K., Kiwamu

SHIFT SUMMARY: Few hiccups during lock acquisition. Sheila found that the CSOFT_Y was running away during DC_READOUT_TRANSITION (I believe) which probably caused a lockloss at DC_READOUT we had earlier. later ISS 2nd loop wouldn't engage. Kiwamu had to do it by hand. Microseism slowly coming down. Seismic activity in EQ band is nominal. Wind ~5mph.

INCOMING OPERATOR: Cheryl

ACTIVITY LOG:

00:51 Locked at NOMINAL_LOW_NOISE

01:00 Robert and Vinney to water pump area to do tamper injection.

01:45 Robert back

01:47 Switched to Undisturbed.