Ops Day Summary
Corey Gray, Eric Allwine, Hugh Radkins worked on marking and drilling holes for the HAM 12 Pier Anchor Bolts

Gerardo Moreno started removing the H2 optical lever power supplies from the LVEA

Paul from Control Solutions NW came to fix the FMCS system in the control room

Patrick Thomas, David Barker removed the control2 sun computer and replaced it with the control10 linux computer, also removed the windows control room Spiricon PC

Richard McCarthy, Filiberto Clara removed the H2 electronics in mid Y

Cheryl Vorvick, Aidan Brooks worked on decommissioning H2 TCS

GV5 and GV7 were soft closed, the Genie-lift was craned over the beam tube, cleaning and crane lift tests continued in the LVEA

Cyrus Reed went to look at the phone system in mid Y

Reboldt Mallon worked on repairs, concrete grading, roof at mid Y