Displaying report 1-1 of 1.
Reports until 17:16, Wednesday 14 October 2015
LHO General
corey.gray@LIGO.ORG - posted 17:16, Wednesday 14 October 2015 (22526)
Transition To EVE Shift Update

TITLE:  10/14 EVE Shift:  23:00-07:00UTC (16:00-00:00PDT), all times posted in UTC     

STATE of H1:  Taken to Observation Mode @75Mpc during Operator hand-off.  Current lock going on 5hrs.

Outgoing Operator:  Jim

Support:  Occupied Control Room, Kiwamu is On-Call if needed

Quick Summary:

All looking quiet on the seismic front (useism low, EQ band also low, & winds are under 10mph).

Jim walked me through/reminded me how to address low (under 8%) ISS Diffracted Power by tweaking the REFSIGNAL slider.

Robert also wanted me to keep him posted on any possible FMCS alarms (since he's been making HVAC changes).  He mentioned possibly doing more of this work if time allows.

Jenne also walked me through running the A2L scripts every time before going to Observation Mode per her alog (WP22524).

Displaying report 1-1 of 1.