TITLE: 10/14 EVE Shift: 23:00-07:00UTC (16:00-00:00PDT), all times posted in UTC
STATE of H1: H1 was down due to EY temperature variations & passed on to Cheryl to take over.
Incoming Operator: Cheryl
Support: Sheila was consulted over the phone
Quick Summary: Mostly decent shift except for a lockloss toward the end of the shift which is most likely due to temperature variations at EY (see John's alog). I handed over H1 to Cheryl as it was on its way to locking DRMI (no initial alignment was undertaken, only ETMy & TMSy were moved to restore H1 to locking).
Shift Activities: