Reports until 08:04, Saturday 17 October 2015
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 08:04, Saturday 17 October 2015 (22599)
Ops Owl Shift Summary

TITLE: "10/17 [OWL Shift]: 07:00-15:00UTC (00:00-08:00 PDT), all times posted in UTC"

STATE Of H1: Observing at ~80 Mpc. IFO has been locked for 26 hours.

SUPPORT:

SHIFT SUMMARY: Nothing exciting until a 6.0M earthquake in Argentina (the R-wave arrive time was 05:19:26 PDT). LLO has been down for ~3 hours. The seismic activity in the earthquake band has come back to nominal. Low wind through out the night.

INCOMING OPERATOR: Patrick

ACTIVITY LOG:

14:50 Patrick's here early. He let a contractor through the gate (sprinkler blownout).