Reports until 08:07, Saturday 17 October 2015
LHO General
patrick.thomas@LIGO.ORG - posted 08:07, Saturday 17 October 2015 (22600)
Ops Day Beginning Shift Summary
TITLE: 10/17 [DAY Shift]: 15:00-23:00 UTC (08:00-16:00 PDT), all times posted in UTC
STATE Of H1: Observing @ ~ 78 MPc.
OUTGOING OPERATOR: Nutsinee
QUICK SUMMARY: From the cameras the lights are off in the LVEA, PSL enclosure, end X, end Y and mid X. I can not tell if they are off at mid Y. Seismic in 0.03 - 0.1 Hz band has just recovered from an earthquake and is around .015 um/s. Seismic in 0.1 - 0.3 Hz band is around .07 um/s. Winds are less than 10 mph.

Company on site blowing out sprinklers.