Displaying report 1-1 of 1.
Reports until 16:03, Sunday 18 October 2015
LHO General
patrick.thomas@LIGO.ORG - posted 16:03, Sunday 18 October 2015 (22621)
Ops Day End Shift Summary
TITLE: 10/18 [DAY Shift]: 15:00-23:00 UTC (08:00-16:00 PDT), all times posted in UTC
STATE Of H1: Locked. Observing @ ~76 MPc.
SUPPORT: None
SHIFT SUMMARY: Recovered from earthquake in Tonga.
Seismic in 0.03 - 0.1 Hz recovered from earthquake but then trended up to .1 um/s at end X and end Y. Seismic in 0.1 - 0.3 Hz appears to be settling between .1 and .8 um/s. Can hear what may be the wind on the side of the building in the control room. Came up to about 20 mph and is now decreasing.
INCOMING OPERATOR: Ed
ACTIVITY LOG:

16:16 - 16:22 UTC Stepped out of control room
19:17 - 19:30 UTC Stepped out of control room

21:33 UTC Vern taking family to X arm overpass
Displaying report 1-1 of 1.