Activity Log: All Times in UTC (PT) 00:00 (00:00) Take over from Ed 10:53 (03:53) ETM-Y saturation 11:08 (04:08) ETM-Y saturation 12:37 (05:37) Reset timing error on ETM-X 15:00 (08:00) Turn over to Patrick End of Shift Summary: Title: 10/19/2015, Owl Shift 07:00 – 15:00 (00:00 – 08:00) All times in UTC (PT) Support: None needed Incoming Operator: Patrick Shift Summary: Quiet shift – IFO locked at LOW_NOISE for the past 10 hours. 80Mpc range. Intent Bit set to Observing all shift. Winds calm all night. Seismic activity low. There was a 5.8 mag EQ in the Philippines, R-Wave due at LHO ~14:43 (07:43). No apparent problems with the EQ at LHO.