Activity Log: All Times in UTC (PT) 07:00 (00:00) Take over from TJ 07:46 (00:46) ETM-Y saturation 08:24 (01:24) ETM-Y saturation 09:22 (02:22) ETM-Y saturation 09:33 (02:33) Reset timing error on ETM-X 09:53 (02:53) ETM-Y saturation 10:42 (03:42) ETM-Y saturation 12:19 (05:19) ETM-Y saturation 12:39 (05:39) ETM-Y saturation 13:05 (06:05) LLO – Going down for maintenance 13:33 (06:33) Power Hit – Short duration power loss 14:15 (07:15) Richard – Going to End-Y to check end station and reset ESD high voltage 14:26 (07:26) Fire Systems Maintenance on site to test hydrants 14:30 (07:30) S&K Electrical on site 14:48 (07:48) Richard – Back from End-Y 14:50 (07:50) Richard – Going to End-X to check end station and reset EDS high voltage 14:55 (07:55) Ken – Going to End-Y to pull cables from End Station to Ion Pump 14:57 (07:57) Karen & Christina – Cleaning in the LVEA 15:00 (08:00) Turn over to Travis End of Shift Summary: Title: 10/20/2015, Owl Shift 07:00 – 15:00 (00:00 – 08:00) All times in UTC (PT) Support: Richard, Peter Incoming Operator: Travis, Shift Summary: 13:33 (06:33) – Lost power to site for a couple of seconds, but long enough to shut down most systyems. Starting site recovery. Peter working PSL recovery. Richard working on site recovery.